I am currently trying to export a batch list containing several clips with the clips Name and Duration columns, and I would like to have the Duration show frames rather than timecode. I can get the Duration to show frames in the Final Cut Pro project bin, however, when I export the bin as a batch list and open it with Microsoft Excel, the Duration column is displays timecode, and not frames. Can anybody explain why this is and/or offer a solution?