P2 records in pairs (soon to be quad)
Using a storecase drive (fan cooled)
A project folder is made and contains a folder named "Reel 001"
In that folder are folders "A" & "B"
The top P2 card goes into A an the bottom into B. (all contents)
This HD has a back up in the field and is cloned at the end of the day.
You import all P2 into your edit project drives from the primary drive and then shelve it.
The back up "clone" returns to the field.
Once the edited project is completed the "Capture Scratch" folder joins the
shelved HD containing the raw.
That's how I do it.
For now anyway.