5D and 7D clips problems in the time linePosted by maltess2
Hello, I wan to edit a diveo with 5D ad 7D clips. I did the log and transfer process to prores 422. I drag 5D clips into the timeline, than when I put the 7D clips, I get a render green line. The same if I put the 7D clips first, then I get the green line fo 5D clips.
I was suggestad in another forum that 5D could be 25p and 7D could be 30P or different. But I did check sequence setting and thay both seem to be 25P, when i check the 7D clips properties I see they are 25fps. What am i doing wrong? how can I work with both clips? Best regards
Yes, it's the problem. You need them both to be the same to not encounter the render bar. Also, using the FCP timeline to 'convert' them to the same frame rate will probably do a substandard job.
Figure out what you like to output and go with that. Also, smack your camera people for not talking to each other and not shooting at the same rate.
OK, I would keep the 5D material because I already started to edit that. 5D is 23,97. So I would like to convert the 7D 25fps. What would be the process and what software I need to use? I am unexperienced, sorry I dont quite understand the export , comform and import explanation.
By exporting you mean the final output of the project from FC . So I have to convert the 7D material and import those clips again in FC. Should I go from the original files or the proress converts? One question, I live in europe, this is a wedding video and I have to export in DVD with maximun possible quality. Is the material is 25fps or 23,97 , does this make any difference for DVD quality in PAL countries? Thanks alot!